Trust Saves Money: Hourly vs. Lump-Sum BIM Contracts Explained
Wondering whether to hire your BIM partner on an hourly or lump-sum basis? In this post, we break down the pros and cons of each pricing model, and why trust and transparency often make a bigger impact on your budget than the contract itself.
The DIY Trap: Why Delegating BIM Coordination Actually Saves You Time (and Money)
Doing your own BIM coordination may seem cost-effective, but it often leads to delays and missed issues. Here’s why hiring us saves you time and money.
Why BIM Coordination Works Best at 80%: Clearing the Big Rocks in Preconstruction
The best time to begin BIM coordination is when design is nearly complete, before final drawings are locked. Avoid delays and clashes with early coordination.
Case studies live under Projects.
Got a project that requires BIM?
Send us your drawings. You'll hear back from a BIM professional, not a sales rep.